Bravo Consult provides RPEQ civil engineering for subdivisions and developments throughout Logan — from infill lots in Springwood and Loganholme to the growth areas around Park Ridge, Logan Reserve and Jimboomba — under the Logan Planning Scheme 2015.




Logan is one of the fastest-growing council areas in South East Queensland, and it has a planning system to match: a risk-based flood approach, its own water business (Logan Water) and two state-run Priority Development Areas. We prepare the concept engineering plans and reports your town planner needs for the Logan DA, then manage operational works, construction and plan sealing.
Our engineers have run their own subdivision projects and a civil construction company, so designs are costed with construction in mind. On a Logan site that often means getting the stormwater and lawful point of discharge right at concept stage, where the risk-based flood mapping can otherwise reshape a project late.
We work across all of Logan, from the established suburbs along the Pacific Motorway to the southern growth corridor.
Springwood · Underwood · Rochedale South · Slacks Creek · Daisy Hill · Shailer Park · Loganholme · Tanah Merah · Beenleigh · Eagleby · Browns Plains · Regents Park · Marsden · Crestmead · Park Ridge · Logan Reserve · Chambers Flat · Jimboomba · Yarrabilba · Flagstone · Greenbank · Logan Village
The Logan Planning Scheme 2015 (version 9.2, July 2025) applies today, and Council is part-way through replacing it: the draft Logan Plan went to consultation in late 2025 with new housing forms and updated flood mapping. We design to the current scheme with the direction of the new plan in mind, so projects are not caught by the change.
Logan Planning Scheme 2015, currently version 9.2 (July 2025). The draft Logan Plan, consulted in September and October 2025, will replace it; the 2015 scheme applies until the new plan is adopted.
Logan Water, a business unit of Logan City Council, provides water and sewer. Connection design and approval run alongside the operational works application rather than through a separate utility.
Council uses a risk-based flood hazard approach, so we obtain the Council flood level report at the outset. Yarrabilba and Greater Flagstone are Priority Development Areas assessed by Economic Development Queensland.
Flooding is where Logan differs most from Brisbane. Council uses a risk-based approach to flood hazard rather than a single defined flood line, so two lots on the same street can carry different constraints. We pull the Council flood level report and Logan PD Hub property report at the outset and build the stormwater and earthworks strategy around them, which keeps information requests to a minimum.
In the Yarrabilba and Greater Flagstone Priority Development Areas the assessment manager is Economic Development Queensland under the PDA development scheme, and the engineering standards differ from Council’s. We prepare the package to suit whichever authority is assessing, and we design water and sewer to Logan Water’s requirements so the two approvals run in parallel.
We design to the current version of the Logan Planning Scheme 2015 and its planning scheme policies, prepare the engineering for the DA and respond to any information request from Council.
A flood level report from Council sets the applicable levels for a specific lot. We use it to fix floor levels, earthworks and stormwater design before the DA is lodged.
We design water and sewer connections to Logan Water’s standards and manage the approval alongside operational works.
Both are Priority Development Areas, so development applications are assessed by Economic Development Queensland under the PDA development scheme rather than by Logan City Council. The engineering standards and lodgement process differ, and we prepare the package accordingly.
Logan City Council uses a risk-based flood hazard approach. A flood level report from Council tells you the applicable levels for a specific lot, and we use that to set floor levels, earthworks and stormwater design before the DA is lodged.
Yes. A draft Logan Plan was released for consultation in September 2025 to replace the 2015 scheme, with new housing forms and updated flood mapping. Until it is adopted, the Logan Planning Scheme 2015 (v9.2) applies.
Allow up to around $200,000 all-in for a typical one-into-two lot subdivision in South East Queensland, including planning, engineering, council charges and construction. We can give you an obligation-free estimate once we have seen the lot.