Bravo Consult provides RPEQ civil engineering for subdivisions and developments across the City of Moreton Bay — Brisbane’s northern growth corridor — under the Moreton Bay Regional Council Planning Scheme 2016 and with Unitywater for water and sewer.




Moreton Bay is where much of South East Queensland’s new housing is going: Caboolture West, Morayfield, Burpengary and Narangba in the north, infill around Strathpine, Kallangur and Petrie, and the Redcliffe peninsula. We prepare concept engineering plans and reports for the DA, then take projects through operational works, construction and plan sealing with Council and Unitywater.
Our engineers have built their own subdivisions and run a civil construction company, so the design is set up to be constructed economically. On Moreton Bay sites that usually means dealing early with the riparian and wetland setback overlays, flood hazard mapping and Unitywater’s connection requirements, which are where projects most often stall.
We cover the full council area — the southern suburbs along Gympie Road, the Redcliffe peninsula and the northern growth corridor.
Strathpine · Bray Park · Brendale · Petrie · Kallangur · Dakabin · Murrumba Downs · Griffin · North Lakes · Mango Hill · Redcliffe · Kippa-Ring · Scarborough · Deception Bay · Narangba · Burpengary · Morayfield · Caboolture · Caboolture West · Bribie Island · Samford · Dayboro
The Moreton Bay Regional Council Planning Scheme 2016 still governs subdivision today. It has passed the ten-year mark and in February 2026 Council resolved to prepare a replacement scheme — a multi-year process. We keep track of the amendments so your engineering is assessed against the right version.
Moreton Bay Regional Council Planning Scheme 2016, the first single scheme for the former Caboolture, Pine Rivers and Redcliffe areas. Council resolved in February 2026 to prepare a replacement; the 2016 scheme applies until it is adopted.
Unitywater is a separate distributor-retailer, so the connection application is lodged with Unitywater while operational works go to Council. We manage both approvals in parallel.
Riparian and wetland setbacks, flood hazard and bushfire overlays shape most greenfield layouts. Caboolture West is a Priority Development Area assessed by Economic Development Queensland.
Environmental overlays do a lot of the work in Moreton Bay. The riparian and wetland setbacks overlay, the flood hazard overlay and bushfire mapping routinely shape where lots and roads can go, particularly on the larger greenfield parcels around Narangba, Burpengary and Morayfield. We address those overlays in the concept engineering so the town planner has a layout that works before the DA goes in.
Water and sewer are provided by Unitywater, so connection applications run in parallel with Council’s operational works approval. Caboolture West is a Priority Development Area assessed by Economic Development Queensland, with its own development scheme and infrastructure standards; we prepare the engineering to suit the assessing authority.
We design to the current version of the 2016 scheme and its planning scheme policies, prepare the engineering for the DA and respond to any information request from Council.
We check the riparian and wetland setbacks overlay and the flood hazard mapping at the outset, and design the lot layout and drainage around them.
We design water and sewer connections to Unitywater’s standards and lodge the application alongside operational works.
Unitywater. It is a separate distributor-retailer, so the connection application is lodged with Unitywater while operational works go to Council. We manage both.
No. Caboolture West is a Priority Development Area assessed by Economic Development Queensland under its own development scheme. We prepare the engineering package to the PDA standards.
Council resolved in February 2026 to prepare a replacement for the 2016 scheme. The replacement will take several years; the Moreton Bay Regional Council Planning Scheme 2016 applies until it is adopted.
Often, yes. The riparian and wetland setbacks overlay sets buffers from waterways, and the layout needs to respect them. We check the overlay mapping and flood hazard early and design the lots and drainage around it.