Bravo Consult provides RPEQ civil engineering for subdivisions and developments throughout the Redlands — Cleveland, Capalaba, Victoria Point, Thornlands and Redland Bay — under the Redland City Plan and with Redland Water for water and sewer.




The Redlands combine bayside infill around Cleveland and Capalaba with a southern growth front at Thornlands, Victoria Point and Redland Bay — and some of the strictest environmental overlays in South East Queensland. We prepare the concept engineering plans and reports your town planner needs for the Redland DA, then take the project through operational works, construction and plan sealing.
Our engineers have built their own subdivisions and run a civil construction company, so designs are set up to be built economically. On Redlands sites that means resolving koala habitat, waterway and coastal hazard constraints in the concept layout, and designing stormwater and services that Council and Redland Water accept the first time.
We cover the full council area, from the bayside suburbs to the southern growth front and the hinterland.
Cleveland · Ormiston · Wellington Point · Birkdale · Thorneside · Capalaba · Alexandra Hills · Thornlands · Victoria Point · Redland Bay · Mount Cotton · Sheldon · Coochiemudlo Island · Russell Island · Macleay Island
The Redland City Plan has governed subdivision since 2018 and is layered with environmental overlays. Koala habitat mapping most often decides a Redlands project, so we work with your planner and ecologist from the first concept rather than redesigning after an information request.
Redland City Plan, in effect since October 2018 and amended since. Koala habitat (state conservation mapping and Council designated koala areas), waterway corridor, bushfire and coastal hazard overlays shape most layouts.
Redland Water, a business unit of Redland City Council, provides water and sewer. Connection design and approval run alongside the operational works application.
Flood and storm tide mapping sets minimum floor levels on the bayside. The Southern Thornlands Priority Development Area (890 ha, around 8,000 homes, declared April 2025) is assessed by Economic Development Queensland.
Flooding and storm tide are the constants on the bayside, from Cleveland and Wellington Point through to Redland Bay. Council’s flood and storm tide mapping sets minimum floor levels and can rule out fill, so we prepare flood and overland flow reports with the DA where the overlays apply, and design stormwater to protect the creeks and Moreton Bay.
The biggest change in years is the Southern Thornlands Priority Development Area, declared in April 2025: 890 hectares planned for around 8,000 homes, assessed by Economic Development Queensland under its own development scheme. We prepare engineering to suit whichever authority is assessing, and design water and sewer to Redland Water’s requirements so the approvals run in parallel.
We design to the current City Plan and its planning scheme policies, prepare the engineering for the DA and respond to any information request from Council.
The state koala habitat mapping and Council designated koala areas restrict clearing, so the layout has to work around retained habitat and waterway corridors. We design with your planner and ecologist from the outset.
We design water and sewer connections to Redland Water’s standards and manage the approval alongside operational works.
Sometimes. The state koala habitat mapping and Council’s designated koala areas restrict clearing, so the layout has to work around retained habitat. We design the civil layout with your planner and ecologist from the outset so the application is defensible.
Redland Water, a business unit of Redland City Council. Connection design and approval run alongside the operational works application.
A Priority Development Area of about 890 hectares declared in April 2025 and planned for around 8,000 homes. Development there is assessed by Economic Development Queensland under the PDA scheme rather than by Council.
If the lot is in the flood or storm tide overlay, Council will expect an assessment and may set minimum floor levels. We check the mapping first and prepare the report with the DA if it is needed.