Guest post by Alex Steffan, Director of Steffan Harries, a Brisbane town planning consultancy.
At Bravo Consult, we work alongside Steffan Harries on subdivision and development projects across South East Queensland. We asked their team to share the planner’s side of the story: when to bring a town planner into your project, and what it can cost you to leave it too late. For the engineering side, read our guest post on their blog, 5 Reasons to Engage a Civil Engineer Early in Your Subdivision.
We get this question a lot: “When should I call a town planner?” Many people assume it’s once the plans are drawn and it’s time to lodge with Council.
The short answer is earlier than you think. Ideally, before you buy the site, and certainly before anyone draws a layout. Here’s how a planner adds value at each stage, and what it can cost you to leave it too late.
1. Before you buy: due diligence
The most valuable time to involve a town planner is before you sign a contract, or during the due diligence period. A listing that says “subdivision potential” is a sales pitch, not a planning assessment.
A planner will check:
- Zoning and minimum lot sizes. What the planning scheme expects for lot size, frontage and density in that zone.
- Overlays. Flood, overland flow, bushfire, biodiversity, heritage, character and steep land overlays can all limit or complicate development.
- Level of assessment. Whether the proposal is likely to be code assessable or impact assessable. Impact assessment means public notification, potential submissions and appeal rights for third parties.
- Neighbourhood plans and local rules. Site-specific provisions that can override the general zone outcomes.
- Existing approvals and easements. Anything on title or in Council’s records that affects what you can do.
This is also the right time to bring in your civil engineer for a quick servicing check. Together, a planning and engineering desktop review gives you a realistic picture of yield, risk and cost before you’ve committed a dollar to the site.
2. Before you design: getting the layout right
Once you own the site, the temptation is to get a surveyor or designer to sketch the lots straight away. Bring the planner in first, or at the same time.
A lot layout that ignores the planning scheme can look great on paper and still be refused or heavily conditioned. We look at lot sizes and dimensions, access handles and driveways, building envelopes, setbacks and how the layout responds to overlays and neighbours. Where a proposal doesn’t quite meet an acceptable outcome, we work out whether there’s a defensible performance-based argument, or whether a small change avoids the problem altogether.
This is where planning and engineering need to talk. The planner knows what Council will accept. The engineer knows where the sewer can connect, where stormwater has to go and where the overland flow path runs. Getting both into the room before the layout is locked avoids redrawing it later.
3. Before you lodge: pre-lodgement and the application
For anything beyond a straightforward proposal, a pre-lodgement meeting with Council is often worth the time. Your planner can prepare a clear brief, ask the right questions and test any departures from the planning scheme before you’ve spent money on a full application. Council’s feedback isn’t binding, but it tells you where the assessment is likely to focus.
Then comes the development application itself. Under Queensland’s Planning Act 2016, a well-prepared application includes the right forms and owner’s consent, a planning report that responds to every relevant code, and the supporting technical material, such as a concept engineering services plan or stormwater report. The planner pulls these together into one coherent package and makes sure any referral agencies, like the State Assessment and Referral Agency, are identified up front.
An application that answers Council’s questions before they’re asked is the best way to avoid an information request, and the delay that comes with it.
4. During assessment and after approval
A planner’s job doesn’t end at lodgement. During assessment we’re the point of contact with Council. If an information request arrives, we coordinate the response with the engineer and other consultants so it answers the question fully the first time.
When the decision notice comes out, read the conditions carefully, ideally with your planner and engineer. Conditions drive the cost and sequence of everything that follows: operational works, infrastructure charges, service connections and the requirements for plan sealing. If a condition is unreasonable or unclear, there may be an opportunity to make representations during the applicant’s appeal period and seek a negotiated decision. That window is short, so it pays to have your planner ready.
Later, if the design needs to change, a planner can advise whether it’s a minor change or something that needs a new application, and handle the change application or extension of the approval if timing slips.
Already have plans drawn? It’s not too late
If you’ve already got a design, or even an approval, a planner can still help. We can review the layout against the planning scheme, flag risks before lodgement, or help you work through conditions. The earlier we’re involved, the more options you have, but it’s never too late to get good advice.
The bottom line
Involve a town planner as early as you can: before you buy if possible, and before the layout is drawn at the latest. Pair that with early civil engineering advice, and you’ll know what the site can achieve, what it will cost and how to get it approved, before the big money is spent.
About the author

Alex Steffan, Director, Steffan Harries. Steffan Harries is a Brisbane town planning consultancy based in Stones Corner, helping landowners, developers and builders across South East Queensland with site due diligence, subdivisions and development applications, from first enquiry through to approval.
Thinking about developing your property?
Talk to Steffan Harries about what your site could achieve: steffanharries.au or 07 3317 0042.
For civil engineering advice on servicing, stormwater and operational works, contact the Bravo Consult team on +61 7 3062 9319.